Printing…
Out of character. Real dates, rounded to the hour. Nothing here happens in the city, and nothing here says who plays whom. The six rulesClosed test 3, build 0.9.3Back to the city
Printing…
Build 0.9.3 is on the closed-test servers. Test 3 keeps running; nothing resets with this build.
When a shipment is selected for physical inspection, the Harbor Authority notice now prints the duty you will owe on clearance, before the lot is released. The copper case from the samples reads:
| Shipment | Declared | Rate | Duty due on clearance |
|---|---|---|---|
| SH-4471, 18 t Copper | $133,560 | 6% | $8,014 |
This closes the idea #3207, which 1,184 of you voted for. The release estimate keeps its mark: it is a range, and it is Estimated.
A waybill now prints the arrival as a range with its mark ("6–14 h, Estimated") instead of a single time. The single time was wrong more often than it was right, and it looked Known.
Run your standing orders against a customs hold on purpose, and tell us in Balance and economy whether the duty line changed what you did.
Read the clauses. Everybody here does.
Edited 2 times, last . Every revision is public.
The arrival ranges are the right call. As a carrier I would rather promise "6–14 h" and keep it than promise 09:00 and miss it.
One question: does the range on the waybill include the time a lot sits under inspection, or only the road?
In reply to gantry, post 2
does the range on the waybill include the time a lot sits under inspection, or only the road?
Only the road and the handover, for now. The inspection window is printed on the Harbor Authority notice (Wed 11:30–14:00 in the sample, Estimated). We kept them apart because they are different people's promises: the carrier promises the road, the Authority promises nothing.
Folding them into one range is on the list for 0.9.4 as a second line on the waybill, not a merged figure.
The duty line is good. It also means I now know exactly how much a hold costs me before I can do anything about it, which is grim, but fair.
Thanks. A second line works for me. Keep the Authority's estimate marked as theirs.
The sample prints 5 of 47 posts. The real thread loads the rest as you read (paged by 20, every page its own URL for search engines).